Fees
Forms
Tree Ordinance
Construction Site
General Contractor / Construction Site Rules:
- All contractors, subcontractors and suppliers must obtain a pass from the Guard House.
- Speed limit inside the community is 25 MPH. Please inform all subcontractors and suppliers of this speed limit.
- Access is allowed only to the properties where you are currently working. Contractors are not allowed to use any of the facilities of the community, including lakes, pools and/or wildlife areas.
- Do not feed or molest alligators ? maximum fine is $200.00. If you have a nuisance alligator at your job site please contact Waccamaw Management immediately and they will contact the Wildlife Department.
- Construction site must be kept clear of trash at all times. Dumpsters are mandatory on site at all times during the . construction process. Loose trash that may be scattered by wind must be contained.
- Construction site must be cleared of construction debris and policed before the crew leaves each day.
- No burning of trash on the property is allowed.
- No construction site signage is permitted without approval of the ARB. One approved sign may be placed on each site. Signs must be removed when the Certificate of Occupancy for the home is issued.
- Street right-of-ways are not to be used for storage of materials or parking.
- All portable toilets are to be located a minimum of 35 feet from the curb line. The toilets must be screened as much as possible from the street and/or adjacent neighbors.
- Parking must be contained to the construction site. If that is impossible, please contact the ARB office for a designated parking location.
- No parking or driving on pedestrian or golf cart paths.
- Walking, bike and golf cart paths must be kept clear, clean and unobstructed at all times.
- Radio noise must be kept to a minimum.
- Hurricane Preparation (after a Hurricane Warning has been issued)
a. Remove dumpsters from work site.
b. Remove portable toilets from work site.
c. Secure all materials and equipment which cannot be removed from work site.
d. Be prepared to leave when evacuation orders are given. - After storm clean-up
The Owner of the property is ultimately responsible for the actions of his or her contractor with respect to the construction of the owner's residence.
Construction Signage:
Home builder or general contractor signature signs will be allowed if the sign meets the following standards:
- Post should be a single 4x4 painted white. 60 inches in height above natural grade. Top should be beveled on four sides to form a shallow pointed top.
- Sign shall be an 18 x 24 inch sign field with a white background and dark blue letters. The sign should be mounted 10 inches below the top of the post. Lettering style is the builder?s choice. Sign may contain builder?s standard logo, builder?s name and telephone number and property identification (lot # or address), but no other copy.
- Location must be a minimum of 10 feet behind the front lot line. No additional signage that is visible from the street, adjacent lots or golf course is permitted. No signs may be nailed or otherwise attached to trees.
- Signs may be placed upon final ARB approval being given and Construction Sign Fee remitted. All Construction Signage must be removed when the Certificate of Occupancy is issued and before a final inspection for return of any deposits held can be requested.
- No Real Estate "For Sale" signs are permitted.